Place-Based Power Infrastructure

Why SNRG

Today's grid is not built
for tomorrow's demand.

1

SmartGrid benefits

The SmartGrids 'Place-Based Power' approach empowers businesses and developers to:

Unlock Capacity

Unlock Capacity: Support additional buildings, electrify heat and transport, and accommodate higher operational loads—without triggering grid reinforcement.

Our sectors

Case Study: Marelli

UK businesses face structurally high electricity costs. Onsite and private wire generation can reduce them — but complex site infrastructure and grid constraints often limit what can be deployed.

SNRG enables industrial sites to integrate and operate generation, storage and flexible load as a single system — unlocking more capacity within existing limits and delivering lower long-term energy costs through a funded PPA.

Find out more
Industrial & Manufacturing case study
Industrial & Manufacturing supporting image
Case Study: Marelli

UK businesses face structurally high electricity costs. Onsite and private wire generation can reduce them — but complex site infrastructure and grid constraints often limit what can be deployed.

SNRG enables industrial sites to integrate and operate generation, storage and flexible load as a single system — unlocking more capacity within existing limits and delivering lower long-term energy costs through a funded PPA.

Case Study: Donaldson Portfolio

Large real estate portfolios require scalable energy strategies across multiple buildings.

In practice, deployment is often constrained by limited roofspace, fragmented infrastructure and the complexity of managing standalone systems — limiting the impact of traditional approaches.

SNRG enables portfolio-wide deployment of generation, storage and flexible demand under a single PPA — funded, delivered and operated with no upfront capital — reducing energy costs and improving asset performance at scale.

Donaldson Portfolio
Case Study: Harwell

Airports, ports, science parks and other large campuses often operate across extensive private electrical networks with multiple buildings, occupiers and demand profiles. These environments are frequently constrained by import/export capacity and internal network limitations, restricting growth, electrification and onsite generation.

SNRG delivers integrated microgrid solutions that coordinate generation, storage and demand across the site — unlocking capacity, enabling expansion and reducing long-term energy costs.

Science, Business, and Transport Campuses case study
Case Study: Otterpool Park

New towns and large-scale housing developments must support full electrification — from heat pumps and EV charging to rooftop solar and battery storage. The challenge is operating these assets within grid import and export limits. Without coordination, developments can trigger costly reinforcement and delays.

SNRG enables site-wide coordination of generation, storage and demand to operate within these constraints — unlocking capacity without grid upgrades and supporting long-term community stewardship.

Residential community case study

Presence

SNRG site presence map across the UK
Logo 1
Logo 2
Logo 3
Logo 4
Logo 5
Logo 6
King's School
Harwell
Greencore
GA
Donalds Group
Citizen
BC

Let’s Unlock Energy Savings Together

Book a Discovery Call Contact us Pick a date

This website uses cookies to ensure you get the best experience on our website.